The Phase II Taziba Project focuses on three core objectives: efficient treatment, energy saving and consumption reduction, and eco-friendliness. In line with the project's treatment capacity, influent water characteristics, and effluent standards, we have tailored an aeration disc installation plan—from product selection to system layout—to fully align with project requirements. This includes highly compatible product selection, scientifically designed system layout, and energy-efficient system coordination.
Facing a tight schedule and complex construction conditions for the Phase II Taziba Project, we established a dedicated construction team. Guided by the principle of "safety first, quality priority, and efficiency maintained," the team strictly adhered to the Code for Construction and Acceptance of Water Treatment Structures and the Quality Acceptance Code for Urban Wastewater Treatment Plant Engineering. This ensured efficient progress and high-quality installation of the aeration discs. During construction, weekly coordination meetings were held with the project owner and supervision unit to promptly resolve on-site challenges. As a result, the aeration disc installation was completed two days ahead of schedule, securing valuable time for the overall project trial run.
We provide "full-cycle, multi-dimensional" after-sales support for the aeration disc installation in the Phase II Taziba Project, ensuring the project owner can proceed with complete peace of mind.
+86-18019736003